The 133 guestrooms and suites are tastefully appointed and
fully outfitted to serve traveler's needs. Amenities include a Great Room with
a fireplace, a fully equipped fitness center, indoor heated pool, sauna, and
meeting rooms to accommodate up to 50 people.
The project was constructed utilizing a prefabricated structural
metal stud framing system and precast plank decks for the entire 7 story structure.
This system enabled TRITEC to erect the building at a rate of 1 floor per 8
days. The prefabricated exterior panels were installed for the entire building
within 30 days.
An On-site Chromaglass system handles the sewage discharge.
The project was completed in March, 2001.
Project Size: 75,000 Square Feet Location: Hauppauge, New York Owner: Hauppauge Hotels,LLC Architect: BHA Architects